What rules should be obeyed for correct operation of the Moisture Meter?
Before the onset of testing the instrument should be placed on a horizontal, hard and stable surface.
ensure that the measuring chamber is empty and then place an empty batcher over the chamber in order to tare the instrument with an empty batcher.
do not touch the instrument while taring
pouring a sample into the chamber is performed with a special batcher (the method of pouring might affect the measurement, therefore this operation should be performed in a similar manner every time)